How to get a building permit through BuildSA
Development Services at 1901 S. Alamo, the BuildSA portal, who may apply for a residential permit, plan review, inspections and contractor registration.
A San Antonio building permit starts at one place: the Development Services Department's One Stop, the Cliff Morton Development and Business Services Center at 1901 S. Alamo St. The office is open Monday through Friday from 7:45 a.m. to 4:30 p.m., its phone is 210-207-1111, and most services are tracked through an online system the city calls BuildSA. This guide follows the department's residential pages as they stood in November 2026: when a permit is needed, who may apply, what plan review involves, how inspections work and how contractors are registered. Fees are set in a schedule the department publishes; this guide does not quote amounts.
When you need a permit
According to the department, a building permit is generally required to build, remodel, repair or demolish a structure. Some minor repairs are exempt, and the department keeps a "No Permit Required" list, so check it before assuming a small job needs paperwork. A single project can need several permits, such as building, electrical and plumbing.
The department separates residential work from business and commercial work, and each has its own pages for zoning, plan review, inspections and utility release. Commercial projects add plan intake, the permit process and a certificate of occupancy. This guide covers residential work.
Who may apply
The department's residential permit page spells out who can pull which permit:
- Homeowners can apply for certain permits for their own home. Plumbing is limited to an existing homestead the owner will work on personally. New electrical, plumbing and HVAC components must be done by licensed trade contractors.
- Home Improvement Contractors (non-structural, registered with the city) handle accessory structures under 400 square feet, pools, general repairs, re-roofs without a pitch change and fences.
- Residential Building Contractors (structural, registered) handle all residential building permits, including new homes, foundation repairs, accessory structures over 400 square feet, second-story additions, pools, general repairs, re-roofs with a pitch change and fences.
- Trade Contractors (licensed and registered) handle demolition, electrical, mechanical, plumbing and sidewalk and curb approaches.
If you hire someone, confirm the registration. The department's Contractor Registration and Licensing page says all city and state licensed contractors must register with Development Services before permits are issued, and it offers a "Contractor Connect" search to find registered contractors by type of work. For trades licensed by the state, the page points to the Texas Department of Licensing and Regulation's license search. Registration categories include building and home improvement, demolition, electrical, house mover, mechanical, plumbing (including irrigation), sidewalk, curb and gutter, sign contractors and tree maintenance. Some require a bond or insurance maintained at all times.
Plan review: when it applies and what to submit
Small jobs do not go through plan review. According to the department, general repair and small remodel permits are issued over the counter at the One Stop. Plan review is needed for new homes, room additions over 1,000 square feet and any second-story addition, and the typical initial review takes about three business days.
For a project that needs it, the department lists these submittals:
- The items in its residential checklist and application (IB 101).
- A site plan showing the entire lot, existing structures, the proposed construction and distances to all property lines.
- An energy report (REScheck).
- Two sets of construction drawings, usually including floor plans, a wall section and the items on the Residential Building Application.
- A foundation plan prepared by a licensed engineer.
After the city receives the documents and you pay plan review fees, Development Services routes the plans to examiners. Every residential project gets building, zoning and tree preservation review. Others are added by location: a design district or overlay, flood-plain review by Public Works and review by Historic Preservation in a historic area. That last one matters in places like King William and Monte Vista, which are local historic districts, where the Office of Historic Preservation has its own role. The department also notes that new construction typically requires planting two trees on normal-size city lots.
If the drawings do not meet minimum code, you correct and resubmit; the page advises calling your plans examiner. When all reviews are approved, the city stamps the plans and issues the permit after you pay permit fees. Keep the approved plans on the job site for inspectors.
Two timing rules are easy to miss. Applications expire after 180 days if not actively pursued, and issued permits expire after 180 days without proof of construction or work progress, though one or more 180-day extensions may be granted for a valid reason. For faster starts, the department lists after-hours review, available first-come, first-served for initial submittals with an extra fee, and an early plumbing permit that a licensed plumbing contractor can obtain after tree preservation approval.
Inspections
Inspections follow the permit. According to the department, you schedule them online through the BuildSA portal or by calling 210-207-1111; the phone option carries a $3 per-inspection scheduling fee. An inspection requested before midnight is scheduled for the next day. Building construction inspection types listed are foundations, framing, electrical, mechanical, plumbing and third-party special inspections, which must be done by special inspectors approved by the Building Official. A re-inspection after a failed inspection carries a fee, while a "partial passed" result does not. To dispute a result, contact the inspector's supervisor.
Plan approval does not guarantee a passing inspection, and other permits, such as electrical, mechanical and plumbing, may still be required.
Reporting unpermitted work
If you see work that appears unlicensed, started without a permit or occupied without a certificate of occupancy, the department's line is 210-207-1111, which it describes as anonymous and confidential. Zoning and code violations, such as an overgrown lot or a dumped load, go to 3-1-1 or 210-207-6000, or through the 311 online portal; How to use 311 in San Antonio and how to report a neighborhood problem: code, dumping and animals explain how. Development Services Department is the department's profile.
A short checklist
- Check the "No Permit Required" list.
- Decide who will do the work, and confirm any contractor's registration.
- Check in at the One Stop online, by text or with the Qless app, or apply through the online portal.
- Gather the site plan and drawings if plan review applies.
- Pay fees from the department's fee schedule, then keep the stamped plans on site.
- Schedule inspections as work reaches each stage, and watch the 180-day clocks.