Blog
The Linear Creekway Parks
How San Antonio's roughly 105 miles of greenway trails follow the creeks, what the advisory board does and how to use the trails safely.
Most cities build a trail and then go looking for a place to put it. San Antonio's greenways started from the other end, with water. A city this size, on the southern edge of the Hill Country, is crossed by creeks that stay dry for months and then fill in an afternoon. The land beside them is often too wet to build on and too long and narrow for a conventional park. Parks planners have a name for strips like that: linear parks. The city calls the system of trails along them the Howard W. Peak Greenway Trail System, and a citizens' board has a standing role in how it grows.
What the city says the system is
The Parks and Recreation Department's greenway page describes the Howard W. Peak Greenway Trail System as about 105 miles of multi-use and accessible trails, and says the network is still expanding. The page lists the creek systems the trails follow: Leon Creek, the Medina River, Salado Creek and the Westside Creeks, plus other tributary trails. It counts more than 80 main trailheads, with smaller neighborhood paths feeding the bigger trails and linking dozens of local parks. About 1,700 acres of open space lie near the creeks and in natural areas. The trails are open daily from sunrise to sunset.
That is the system in a paragraph. Three of its features deserve a closer look, because they change how a resident should think about it.
It is a network, not a single trail. The trails run in separate corridors, one per creek system, and not as one unbroken path. That is why the page lists Leon Creek, the Medina River, Salado Creek and the Westside Creeks separately. Anyone planning a long ride has to read the map and see how, and whether, one corridor meets the next.
It is paved and built for many uses. The city calls the trails multi-use and accessible, meaning walkers, runners and cyclists share them and wheelchair users can get on. The department publishes a trail directory, accessibility maps, a map and trailhead guide and downloadable running and biking routes. The rules for sharing are on its Trail Safety and Etiquette page.
It follows the creeks. The trails sit in the same corridors that carry floodwater, so they can close. The department keeps a list of closures on its Parks and Recreation news page, and anyone headed for a trail after rain should look at it first.
Who Howard Peak was
The system is named for a former San Antonio mayor. Reference sources say Howard W. Peak originated the concept of a looped trail system within the city, and the city named the trails for him after he left office. Once out of office he led volunteer work on multi-use hiking and biking paths along the greenways and chaired the Linear Creek Advisory Board; the city's own page uses the name Linear Creekway Parks Advisory Board. He received the State Trail Advocacy Award from the American Trails National Program, according to the reference summary. The mayor's role is a handy reminder that the trails began as a civic idea pushed by a few people for many years, not as a department program.
The advisory board
The Linear Creekway Parks Advisory Board is one of the boards listed on the Parks and Recreation site, alongside the Conservation Advisory Board and the Parks and Recreation Board. By its page, it has 11 members, appointed by the mayor and by each of the ten council members to two-year terms. Its purpose is to give input and advice to city staff and the City Council on acquiring and developing linear parks along the city's major creeks and rivers and their tributaries. It meets monthly, and the page lists the meeting time as the last Tuesday of each month at 6 p.m., usually at a city senior center. The page lists a vacancy for one council district and points to the vacancies link for people who want to apply.
An advisory board does not vote on spending or build trails. Its power is to recommend. In practice, a resident with an opinion about an extension, a crossing or a trailhead has a public body whose meetings are open and whose members come from every council district. To apply for a seat on this or any other city board, see How to apply for a San Antonio city board or commission. The City Clerk handles applications through an online form.
Trail Stewards
The city also fields a Trail Steward team that patrols the system. The department says its stewards monitor more than 100 miles of trails, including the Salado, Leon Creek and Medina River greenway trails and portions of the San Antonio River. They carry a city cell phone on shift, and the page lists their duties:
- talking to trail users, promoting safety and answering questions;
- sharing park rules and trail etiquette;
- giving minor first aid and doing basic bike repair;
- handing out trail maps and emergency water;
- reporting maintenance problems and monitoring trail conditions;
- small jobs such as picking up litter and removing graffiti;
- reporting to the department and to the Park Police.
According to the city's park stewardship page, stewards are trained in CPR, first aid and bike safety, and they work seven days a week, including some holidays. Anyone interested in the program should call the Park Stewardship office, 210-207-8603, the city's listed contact.
Reading the creeks
A map of the greenways is also a map of the watersheds, and the weather facts matter to anyone who uses them.
San Antonio's average annual precipitation is 32.38 inches according to the NOAA normals, but the National Weather Service's records show how lopsided that is. The greatest daily rainfall in the record that began in 1885 was 11.26 inches on October 17, 1998, and the wettest month was 18.07 inches in October 1998. The same record shows a driest year of 10.11 inches, in 1917. Flash flooding is the hazard this area is known for. The September 9 and 10, 1921 flood inundated downtown and killed at least 51 people, and the Olmos Dam was completed in 1926 and a river bypass channel in 1930. The story is in Olmos Dam and the river bypass: how San Antonio tamed its river and The flood of September 9-10, 1921.
A creek trail is where that history shows. Trails near a creek are in the floodway for a reason, and a creek that is a trickle in the morning can be carrying a storm's runoff by evening. The practical rules follow:
- Check closures before you go. The Parks and Recreation closures page lists trail closures. After heavy rain, a closure is normal and expected.
- Watch the weather upstream. Rain that falls miles away reaches a creek later. The NWS office for the area, NWS Austin/San Antonio, posts flood safety information and river forecasts.
- Never cross water. Low-water crossings can look shallow and still be dangerous.
- Sign up for alerts. The city's emergency notification program, AlertSA, is described in Emergency preparedness and signing up for AlertSA.
The longer version of the safety advice is in Flash flood safety in San Antonio.
Using the trails
For riders and runners, the city's biking page and its published route maps are the starting point; see Biking in San Antonio: the bike network plan and local rules. A few practical points from the department's pages:
- The trails are open from sunrise to sunset, not around the clock.
- They are shared, so slower users keep right and faster ones announce themselves; the department's etiquette page has the specifics.
- The Trails Directory lists each trail, and accessibility maps show the surfaces and grades for people who use wheelchairs or other mobility devices.
- Trail issues, such as a downed tree, graffiti or a washed-out section, can be reported through 3-1-1, like any other city problem. For how reporting works, see how to report a neighborhood problem: code, dumping and animals.
The Parks and Recreation Department itself, which also runs the city's pools and facilities, is described in Parks and Recreation Department, with the fact sheet.
A short history of the idea
A linear park is a simple idea with a long list of requirements: land along a creek, a path on it, crossings where roads intervene and neighbors willing to accept a trail behind their fences. Creek corridors are long and narrow, so each trail segment has to be assembled from pieces of public land, easements and purchases, which is why an advisory board focused on acquisition exists. How the system was funded year by year is a question for the city's parks budget records. What the city's description shows is a network that grew to about 105 miles and that the city calls still expanding.
The same shape explains why trail maps matter. A walker or rider follows a creek, not a street grid, so the best way to understand a segment is the Trails Directory and the greenway map and trailhead guide that the department publishes.
Where the creeks meet neighborhoods
The creek corridors are not all in the suburbs. Several of the city's best-known parks and older neighborhoods sit beside water. Woodlawn Lake is a Near Northwest neighborhood around a city park lake and a local historic district. Brackenridge Park and the Garden District covers the park, the zoo and the Japanese Tea Garden beside the river in the area around Mahncke Park, a landscape shaped by the same water. The Mission Reach of the River Walk, which extended the downtown river walk by about 13 miles with the Museum Reach (2009 to 2013), is a different kind of linear park, described in The Mission Reach of the River Walk, from downtown to Mission Espada.
What the greenways add is continuity. A park is a place you go to. A linear park is a place you move through, and its value depends on how far it goes and what it connects. That is the reason the system has an advisory board whose job is to look at acquisition, and the reason it keeps growing a little at a time. A resident who wants the trail extended or a crossing built can attend the board's monthly meeting, send a message through 3-1-1 or raise the subject with the council member for the district. The city's trail pages are the authority on current routes, closures and hours.