Blog
A passenger's guide to San Antonio International's two terminals
San Antonio International has two terminals, A and B, with a third being built. What each is, the history behind them, the airlines and the numbers.
In 1941 the city bought 1,200 acres north of town and called it an airport. It now covers 2,305 acres about eight miles from downtown, with three runways and two passenger terminals, and a third terminal on the way. In 2025 it moved 10,740,694 passengers. The question at the curb is a plain one: which terminal, and what is the airport doing to itself this year?
Here is how Terminal A and Terminal B differ, where the airport came from, who flies out of it, what is being built, and which details belong to the airport's own site rather than to a story like this one.
The airport at a glance
San Antonio International, known as SAT, belongs to the city, and the city's Aviation Department runs it. The same department operates Stinson Municipal Airport, a general aviation field profiled in Stinson Municipal Airport: the city's other airfield. The airport's official site is flysanantonio.com, and the city's record page is San Antonio International Airport.
The basics, from the airport's published profile:
- Location: about 8 miles (13 km) north of downtown.
- Size: 2,305 acres, at an elevation of 809 feet.
- Runways: three, at 8,505 feet (04/22), 5,519 feet (13L/31R) and 8,502 feet (13R/31L).
- Roads: U.S. 281 and Interstate 410. In normal traffic, U.S. 281 gets you downtown in under 15 minutes.
Getting downtown by bus, rideshare or taxi gets its own treatment in Getting from San Antonio International Airport to downtown and the longer comparison in From SAT to downtown: driving, bus or the future Green Line.
Terminal A
Terminal A is the old one. It opened in 1984 with a 16-gate concourse, which brought the airport to 27 gates at the time. It has 17 gates today and handles every international carrier the airport has. A $35.6 million renovation finished on June 18, 2014.
It is also where the newest dirt has been turned. A Ground Load Facility with three ground-load gate positions went under construction in October 2023, built for ultra low-cost carriers such as Frontier, which board passengers from the apron on foot instead of through a jet bridge. The target was early 2025. Local coverage reports that the Terminal A ground-load expansion has opened, and the airport's news page is the word on its current status.
Terminal B
Terminal B opened November 9, 2010, and the original Terminal 2 closed the same day. Accounts differ on whether the demolition finished in 2011 or 2012. A project completed in January 2023 added two gates and brought Terminal B to 10. It has a United Club and a USO.
A rental car facility finished in January 2018, 1.8 million square feet, hangs off Terminal B by a sky bridge. If you are renting a car at SAT, that is where the paperwork happens.
Terminal C, the new one
The airport is building a new terminal. The program that began in 2023 and is scheduled to finish in 2028 includes a new Terminal C with up to 17 gates, six of them able to handle wide-body aircraft. It also renovates Terminal A and upgrades roadways. A roughly $1.2 billion terminal broke ground in December 2024, though some accounts quote $1.4 billion, and local reports say an 18th gate was added to the project in December 2025. The San Antonio Report has described $200 million for Terminal A and $100 million for Terminal B upgrades as part of the plan.
Several of those figures differ by account. Gate counts, costs and completion dates move on a project under construction, and the airport's own pages and the City Council agendas are the definitive record.
A short history
| Date | Event |
|---|---|
| 1941 | The city buys 1,200 acres for what is first called San Antonio Municipal Airport |
| 1943 | Braniff begins service |
| 1944 | American begins service, and the airport is renamed San Antonio International |
| June 1971 | Southwest Airlines launches with San Antonio as one of its three original destinations, with Dallas and Houston |
| 1984 | Terminal A opens with a 16-gate concourse |
| November 9, 2010 | Terminal B opens, and the original Terminal 2 closes |
| June 18, 2014 | A $35.6 million Terminal A renovation is completed |
| January 2018 | The consolidated rental car facility opens |
| January 2023 | Two gates added to Terminal B, bringing it to ten |
| October 2023 | Construction begins on the Ground Load Facility |
| May 2024 | Condor starts seasonal service to Frankfurt, the airport's first nonstop to Europe; it is discontinued a few months later |
| December 2024 | The new terminal project breaks ground |
| 2028 | Planned completion of the terminal program |
Who flies out of SAT
Fourteen airlines fly nonstop to about 45 destinations in the United States and Mexico, according to the airport's published profile, which may be dated. Southwest is the largest carrier, with about 37 percent of passengers from June 2024 to May 2025, followed by American, Delta, United and Frontier. Earlier listings counted more airlines, so any single number is a snapshot.
Which airline uses which terminal is a moving target, since gate assignments change, and the answer is on your itinerary and on the airport's website. The one stable rule in the profile: Terminal A handles all international carriers.
The passenger numbers
| Year | Passengers |
|---|---|
| 2019 | 10,363,040 |
| 2020 | 4,028,564 |
| 2024 | 11,094,278, the busiest year on record |
| 2025 | 10,740,694, down 3.2 percent |
The 2020 plunge is the pandemic. In 2024 the airport also saw its first nonstop to Europe, which did not last. The 3.2 percent decline for 2025 was reported in early 2026, and airport traffic: the 2024 record and the 2025 dip looks at what is known about it. The airport also handled 274,847,470 pounds of cargo in 2025.
Why two terminals became three
The case for a new terminal is in the numbers. The record year, 2024, saw 11,094,278 passengers, more than the 10,363,040 of 2019 and well over double the 4,028,564 of the pandemic year. Terminal A's 16-gate concourse dates from 1984, when the airport had 27 gates in all, and later renovations and the arrival of Terminal B in 2010 rearranged things without making the original building any younger. A new terminal is the city's way of matching capacity to the passenger count and replacing parts that are decades old.
There is a business reason too. Ultra low-cost carriers such as Frontier, which the airport's profile lists among its top five airlines, were the stated target of the ground-load facility begun in October 2023. An airport that wants to keep those airlines has to give them a place to operate at a cost they can accept, and the ground-load facility is one answer.
Southwest, the largest carrier at about 37 percent of passengers over the 12 months to May 2025, has been in the market a long time. It launched in June 1971 with San Antonio as one of three original destinations, so the airline's history and the airport's are tangled together. An airline's share changes with schedules, so read it as a snapshot and not a ranking to rely on.
A hypothetical early flight
Say a traveler has a dawn departure from SAT. These steps use only the airport's published profile and general practice.
- Confirm the terminal the night before. The itinerary names the airline, and the airline's site or app names the terminal. An international flight means Terminal A.
- Pick the way to the airport. Drive up U.S. 281 or I-410, typically under 15 minutes from downtown in normal traffic, or compare transit and rideshare in Getting from San Antonio International Airport to downtown.
- Plan for the building work. With a new terminal going up and others being renovated, check the airport's site for curb or roadway changes.
- If renting a car on return, the consolidated rental facility is reached from Terminal B by a sky bridge.
- Leave margin. Security waits, parking and construction are the airport's to publish, so do not lean on the typical numbers.
The airline's own instructions on arrival times come first, since the carrier sets them.
The airport and the city
SAT sits on the north side, 2,305 acres inside the city's footprint, and the city owns it, which has consequences. Capital projects such as the new terminal go through the City Council and show up in the budget, and the public can comment at council meetings by the process in How to speak at a San Antonio City Council meeting. A terminal quoted at $1.2 billion to $1.4 billion, depending on the account, is among the largest capital projects the city takes on. Fees and charges at the airport fund much of its operations, and the city's budget documents describe how. How to read the San Antonio city budget shows where to find the airport's pages.
The region has other places to fly from. Stinson Municipal Airport, also city-owned, serves general aviation and is the subject of Stinson Municipal Airport: the city's other airfield. "The airport" in San Antonio can mean more than one field, even though SAT is the one for scheduled airline service.
Practical tips
- Check the terminal on your itinerary. An airline's name alone will not tell you.
- Allow time for construction. A terminal going up and another being renovated mean temporary changes to curbs, parking and roads, and the airport's site posts them.
- Confirm details with the airport. Parking rates, security hours, gate-to-curb distances and shuttle schedules belong to the airport and its operators. The airport's site at flysanantonio.com is where they are posted.
- Use the right number. For emergencies, 911. For airport questions, use the airport's own contacts at flysanantonio.com.
- Know the transit connection. VIA's trip planner at viainfo.net lists routes to the airport, and the Green Line, a rapid bus line under construction along San Pedro Avenue, is planned to begin near the airport. See The VIA Rapid Green Line: San Antonio's first advanced rapid transit.
What 10 million passengers say about the region
SAT is the region's main commercial airport, and its numbers measure the size of the metro area: more than 10 million passengers a year in a metro of about 2.6 million residents in the 2020 Census. The construction now under way answers the 2024 record and the limits of the older terminals. When the terminal program finishes in 2028, the airport will not look like the one most residents know.